Preparation is part of the roofing work
The existing roof needs cleaning and preparation appropriate to its material. Loose roofing and failed repairs must be addressed. Adhesion testing helps determine whether the coating can bond as intended, while moisture assessment helps identify material that needs removal.
Seams, equipment curbs and penetrations are repaired and detailed before the field coating is completed. Drain openings must remain functional. A broad, even surface will not compensate for an untreated opening at a wall or pipe.
For example, GAF’s guidance for silicone over asphaltic roofing calls for a clean, dry, tight substrate, adhesion testing and replacement of wet insulation and membrane. The selected coating system determines the preparation, primer and application requirements for the roof.